ArcelorMittal signs a Contrat d’Allocation de Production Nucléaire (CAPN) with EDF to secure low-carbon electricity supply
Type: Ppa · Technology: Nuclear, Industrial · Country: France · Announced: 2025-12-26
ArcelorMittal and EDF signed an 18-year Contrat d’Allocation de Production Nucléaire (CAPN) under which EDF will allocate a portion of its operating nuclear fleet capacity to supply ArcelorMittal's sites in France with low-carbon electricity, with deliveries starting 1 January 2026.
Counterparties
- Électricité de France (EDF) (Ipp)
- ArcelorMittal (Offtaker)
📈 The Sherpa Signal — one notable infrastructure deal a day.