Enviromena acquires 68 MWp Longpasture solar farm from Bluefield Solar and Lightrock Power

Type: Acquisition · Technology: Solar · Country: United Kingdom · Capacity: 68 MWp · Announced: 2026-08-24

Enviromena acquired the 68 MWp Longpasture solar farm in County Durham from Bluefield Solar and Lightrock Power in summer 2025. Enviromena has now started construction on the project, targeting energisation for autumn 2027. Once operational, the Longpasture solar farm is expected to generate enough electricity to supply approximately 14,000 homes annually. The development will also include ecological enhancement measures and a £100,000 community benefit fund administered by Point North.

Analysis

Enviromena acquired the 68 MWp Longpasture solar farm in County Durham from Bluefield Solar and Lightrock Power in summer 2025. Enviromena has commenced construction, targeting energisation for autumn 2027, with the project expected to supply approximately 14,000 homes annually. The development includes ecological enhancement measures and a £100,000 community benefit fund administered by Point North.

Key points

Counterparties

Source article

📈 The Sherpa Signal — one notable infrastructure deal a day.

📘 Sherpa Guides — practitioner guides to developing, financing and acquiring infrastructure.