Greenvolt Power and Bedrock Renewables acquire 116 MW Iowa wind portfolio
Type: Acquisition · Technology: Onshore Wind · Country: United States · Capacity: 116 MW · Announced: 2026-05-19
Greenvolt Power and Bedrock Renewables have acquired three operational wind projects in Iowa with a combined installed capacity of 116 MW. The portfolio includes the 15 MW Hardin Hilltop Wind project, the 21 MW Crosswind project, and the 80 MW Top of Iowa Wind project. These projects, which began operations between 2001 and 2007, are slated for repowering with newer turbine technology to enhance efficiency and extend their operational lifetimes. This acquisition strengthens Greenvolt Power's US portfolio with established wind assets suitable for repowering, aiming to deliver reliable clean energy and long-term value to the counties involved.
Analysis
Greenvolt Power and Bedrock Renewables have announced the acquisition of three operational wind projects in Iowa totaling 116 MW. Greenvolt Power is a renewable energy company focused on developing and operating utility-scale renewable energy projects across Europe and N. The acquired portfolio includes the 15 MW Hardin Hilltop Wind project, the 21 MW Crosswind project, and the 80 MW Top of Iowa Wind project, all of which began operations between 2001 and 2007. These projects are slated for repowering with newer turbine technology.
Key points
- Acquisition of 116 MW Iowa wind portfolio by Greenvolt Power and Bedrock Renewables.
- Portfolio includes Hardin Hilltop (15 MW), Crosswind (21 MW), and Top of Iowa (80 MW) projects.
- Projects began operations between 2001 and 2007.
- Acquisition announced on 2026-05-19.
Counterparties
- Bedrock Renewables (Buyer)
- Greenvolt Power (Buyer)