GreenYellow signs alliance to supply BENTELER with solar energy for 15 years
Type: Ppa · Technology: Solar · Country: Spain · Capacity: 3.641 MW · Announced: 2024-09-10
GreenYellow will supply Group BENTELER's Burgos plant with photovoltaic power for 15 years from a 3,641 kWp solar park located 1 km away and built by Abasol, expected to generate up to 5,738 MWh/year, announced 2024-09-10.
Counterparties
- GreenYellow (Developer)
- Grupo BENTELER (Offtaker)
- Abasol (Epc)
📈 The Sherpa Signal — one notable infrastructure deal a day.