Mercedes-Benz Group AG signs long-term PPA with UKA to build 140 MW wind farm in Papenburg
Type: Ppa · Technology: Onshore Wind · Country: Germany · Capacity: 140 MW · Announced: 2025-09-18
Mercedes-Benz Group AG and UKA Group received permission to install a 140 MW onshore wind farm at Mercedes-Benz's Papenburg test track, to be built with 20 Nordex turbines and supply roughly 20% of Mercedes‑Benz’s annual electricity in Germany under a 25‑year PPA.
Counterparties
- Mercedes-Benz Group AG (Offtaker)
- UKA Group (Developer)
- Nordex SE (Supplier)
📈 The Sherpa Signal — one notable infrastructure deal a day.