Talen Energy and River Pointe Logistics to develop 23-building data center campus in Pennsylvania
Type: Development · Technology: Data Center · Country: United States · Announced: 2026-07-29
Energy firm Talen, through its partnership Slate Belt Holdings LLC with River Pointe Logistics, is planning to develop a material data center campus in Upper Mount Bethel Township, Pennsylvania. The proposed development encompasses 754 acres and could feature up to 23 buildings, each offering 201,500 sq ft, along with a 480MW on-site substation. This project aims to transform a site previously considered for an Amazon campus, which reportedly withdrew due to power availability concerns. Talen Energy, which operates a nearby natural gas power plant, has been actively involved in data center development since 2021, including facilities adjacent to its nuclear power plant, some of which were acquired by Amazon.
Counterparties
- River Pointe Logistics (Developer)
- Slate Belt Holdings LLC (Developer)
- Talen Energy (Developer)
📈 The Sherpa Signal — one notable infrastructure deal a day.