Apto to develop a 240 MW hyperscale data center campus in Fuenlabrada, Madrid, with an investment of up to €2 billion
Apto, a hyperscale data center provider, is developing a 240 MW data center campus in Fuenlabrada, Madrid, with an estimated investment of up to €2 billion. The project, located on a 195,000 m2 site, will feature 5 data centers and includes an on-site substation for 40 MW, with a focus on 50% green energy for the initial phases. Apto is collaborating with Arnaiz, a Spanish urban planning and real estate development company, on this significant digital infrastructure project.
Counterparts (2)
Subscribe to access full counterpart details, deal analysis, and timeline.
Subscribe from €20/mo →Deal Analysis
- 240 MW hyperscale capacity planned for Madrid.
- Up to €2 billion investment.
- 195,000 m2 site with 5 data centers.
- On-site 40 MW substation and 50% green energy target for initial phases.
Source Intelligence
The project site is 195,000 m2. Quote: "un emblemático terreno de 195.000 m2 en Fuenlabrada". The project includes an on-site substation for 40 MW. Quote: "incluida una subestación in situ para 40 MW". The focus is on 50% green energy for the initial two phases. Quote: "con el foco puesto en que el 50% del total de la energía de las dos fases sea 100% verde.". The site is located 14 km from the city center. Quote: "A solo 14 km del centro de la ciudad". The site previously housed an industrial bottling plant. Quote: "el terreno, que anteriormente albergaba una planta embotelladora industrial, ha sido completamente despejado". Construction permit for the first phase has been approved. Quote: "Con el permiso de construcción aprobado para la primera fase del campus". Apto is starting the second phase of 122 MW. Quote: "Apto comienza ahora la segunda fase de 122 MW". The project receives support from Comunidad de Madrid, Invest in Madrid, and Ayuntamiento de Fuenlabrada. Quote: "excelente apoyo por parte de la Comunidad de Madrid, Invest in Madrid y el Ayuntamiento de Fuenlabrada".
"Apto , proveedor de centros de datos de hiperescala de primer nivel en toda Europa, ha confirmado que su nuevo campus madrileño se ubicará en un emblemático terreno de 195.000 m2 en Fuenlabrada ."
"En colaboración con Arnaiz, una empresa líder en planificación urbana y desarrollo inmobiliario con más de 50 años de experiencia en España"
"Esta operación cuenta con el apoyo de la Unión Europea en el marco del programa InvestEU."