Canadian Solar Delivers First Grid-Connected BESS In Japan
2 MW
Capacity
operating
Stage
Naebo Substation BESS
Project
Canadian Solar, through its e-STORAGE division, has delivered its first grid-connected battery energy storage system (BESS) in Japan. The 2 MW/8.25 MWh system, located in Sapporo City, Hokkaido, was developed by Canadian Solar Projects K.K. and awarded under Hokkaido Electric Power Network’s 2023 public land leasing program. The BESS will participate in the Japan Electric Power Exchange (JEPX) and the Balancing Market (EPRX), enhancing grid flexibility and renewable energy integration. e-STORAGE handled the design, engineering, commissioning, and will provide long-term maintenance.
Timeline
Announced
Feb 12, 2026
Signed
Closed
Counterparts (6)
EPC Contractor
Other
Hokkaido Electric Power Network
Hokkaido Electric Power Network, Inc. is responsible for the transmission and distribution of electr...
Japan Electric Power Exchange (JEPX)
Japan Electric Power Exchange (JEPX) is the primary electricity exchange in Japan, facilitating the ...
Balancing Market (EPRX)
EntirelyPets Pharmacy (EPRX.com) is an online pet pharmacy offering prescription medications and sup...
Market Context
This deal is part of the Storage, Battery Storage sector in Japan.
164
Storage deals
21
deals in Japan
1 of 159 Storage deals tracked this month · Updated daily
Global Infrastructure Sherpa