Steel River PV and battery storage project
Project

Cypress Creek Renewables has acquired the Steel River PV and battery storage project from Swift Current Energy. The project, located in Mississippi County, Arkansas, is planned to include approximately 2.45 GW of PV generation capacity paired with 2.9 GWh of battery storage, with an estimated capital investment exceeding $4.5 billion. The acquisition will enable Cypress Creek Renewables to develop a significant renewable energy asset in Arkansas, with all three phases expected to enter service by 2029.

Get daily hybrid deal alerts — free, no spam.

Subscribe to access full counterpart details, deal analysis, and timeline.

Subscribe from €20/mo →

Deal Analysis

Cypress Creek Renewables is making a serious bet on integrated renewables in Arkansas, picking up the Steel River PV and battery storage project from Swift Current Energy. This isn't a small play; the project is planned for 2.45 GW of solar paired with 2.9 GWh of storage, requiring over $4.5 billion in capital investment. For a company that develops, finances, and operates utility-scale renewable assets, this acquisition provides a significant pipeline. All three phases are expected online by 2029, positioning them to deliver substantial, long-term clean energy capacity in the US.
  • Exceeding $4.5 billion capital investment planned
  • 2.45 GW PV paired with 2.9 GWh battery storage
  • All three phases expected in service by 2029
  • Project located in Mississippi County, Arkansas

Source Intelligence

KEY DETAILS

The development is estimated to involve capital investment exceeding $4.5 billion, while construction activities are expected to create 700 full-time jobs and 19 permanent on-site positions.

Capacity
Once completed, the Arkansas facility is planned to include approximately 2.45 GW of PV generation capacity paired with 2.9 GWh of battery storage.
Location
Cypress Creek Renewables, a US-based developer... The Steel River project located in Mississippi County, Arkansas
Announcement
The Steel River project located in Mississippi County, Arkansas remains under development following the acquisition announcement on March 11, 2026.
COD
According to the company statement, all three phases of the Steel River project are expected to enter service by 2029.
PARTIES MENTIONED IN SOURCE
C
Cypress Creek Renewables buyer

"Cypress Creek Renewables, a US-based developer, owner, and operator of solar and energy storage infrastructure, has acquired the Steel River PV and battery storage project from Swift Current Energy."

S
Swift Current Energy seller

"Cypress Creek Renewables, a US-based developer, owner, and operator of solar and energy storage infrastructure, has acquired the Steel River PV and battery storage project from Swift Current Energy."

high quality Enriched Mar 12, 2026

Timeline

Announced
Mar 11, 2026
Signed
Closed

Get the full picture — timeline, source intelligence, and counterpart analysis.

Subscribe from €20/mo →
Track Hybrid deals