Deals Counterparts

Elli commissions first large-scale battery storage system in Salzgitter, Germany

Development Storage announced Salzgitter, Germany Mar 9, 2026
20 MW
Capacity
operating
Stage
PowerCentre
Project

Volkswagen's energy subsidiary Elli has commissioned its first large-scale battery storage system in Salzgitter, Germany. The facility has an output of approximately 20 MW and a storage capacity of 40 MWh. This project marks Elli's entry into the energy storage and electricity trading markets.

Get daily storage deal alerts — free, no spam.

Register free to access full counterpart details, deal analysis, and timeline.

Register free →

Deal Analysis

Elli's commissioning of the 20 MW PowerCentre in Salzgitter, Lower Saxony, represents a direct vertical integration by Volkswagen Group into grid-scale energy services, moving beyond its established electric vehicle charging network. This 40 MWh battery storage system enables Berlin-based Elli to directly participate in electricity trading markets, creating a new revenue stream from its energy subsidiary. The project, announced on 2026-03-09, positions Elli to leverage its parent company's battery technology expertise within the German power grid. This internal development allows Volkswagen to capture value from both EV charging infrastructure and grid balancing services. The PowerCentre's operational status indicates immediate market entry for Elli in the German storage sector. For Berlin-based Elli, this 20 MW PowerCentre in Salzgitter expands its mandate beyond providing energy and charging solutions for electric vehicles, now encompassing grid-scale storage. Volkswagen Group, as Elli's parent company, is directly extending its investment in electric vehicle-related infrastructure, including battery technology, into the German energy storage market. The PowerCentre project complements Elli's existing access to over 600,000 public charging points, creating synergies between EV charging demand and grid stability in Lower Saxony. This development by Volkswagen, a global automotive manufacturer, demonstrates how automotive OEMs are increasingly monetizing battery expertise and energy management capabilities beyond vehicle production. The 2026-03-09 announcement confirms Volkswagen's commitment to developing both charging infrastructure and grid-scale battery technology in Germany.
  • 20 MW output for the PowerCentre project in Salzgitter.
  • 40 MWh storage capacity for the facility in Lower Saxony.
  • Elli, a Berlin-based subsidiary of Volkswagen Group, is the developer.
  • Volkswagen's existing network includes over 600,000 public charging points.
  • Project announced on 2026-03-09.
  • The PowerCentre is already operating.

Source Intelligence

KEY DETAILS

The facility has a storage capacity of 40 MWh. The stored energy will be traded on the European Power Exchange (EPEX). The system incorporates unified cells produced by PowerCo since December in Salzgitter. The Salzgitter project is intended to be the beginning of Elli’s ‘Managed Battery Network’, a platform that will intelligently connect large-scale storage systems, vehicle batteries, and other assets in the future, including playing a major role in bidirectional charging. Quote: 'The facility in Salzgitter has an output of around 20 MW and a storage capacity of 40 MWh.' 'The stored energy will be traded on the European Power Exchange (EPEX).' 'incorporates the so-called unified cells produced by the battery subsidiary PowerCo since December in Salzgitter .' 'The Salzgitter project is intended to be just the beginning of Elli’s ‘Managed Battery Network,’ a platform that will intelligently connect large-scale storage systems, vehicle batteries, and other assets in the future. In other words, Elli also aims to play a major role in bidirectional charging, as this is precisely what is meant in this context regarding vehicle batteries.'

Capacity
The facility in Salzgitter has an output of around 20 MW and a storage capacity of 40 MWh.
Location
Elli commissions first large-scale battery storage in Germany ... The facility in Salzgitter ... Tags ... Salzgitter Lower Saxony
COD
Elli commissions first large-scale battery storage in Germany - electrive.com ... By Florian Treiss 09.03.2026 - 15:19
PARTIES MENTIONED IN SOURCE
E
Elli developer

"Volkswagen’s energy subsidiary Elli has connected its first large-scale battery storage system to the grid."

V
Volkswagen parent company

"Volkswagen’s energy subsidiary Elli has connected its first large-scale battery storage system to the grid."

P
PowerCo supplier

"incorporates the so-called unified cells produced by the battery subsidiary PowerCo since December in Salzgitter ."

high quality Enriched Mar 9, 2026

Timeline

Announced
Mar 9, 2026
Signed
Closed

Get the full picture — timeline, source intelligence, and counterpart analysis.

Register free →
Track Storage deals