EnergRed develops 77 kW solar PV plant for Palomar in Certaldo, Italy

Development Solar announced Certaldo, Italy Mar 9, 2026
77 kW
Capacity
operating
Stage

EnergRed developed a 77 kW solar PV plant for Palomar in Certaldo, Italy, bringing Palomar's total self-consumption to over 740,000 kWh annually.

Get daily solar deal alerts — free, no spam.

Subscribe to access full counterpart details, deal analysis, and timeline.

Subscribe from €20/mo →

Deal Analysis

Palomar is significantly boosting its energy independence in Certaldo, Italy, with a new 77 kW solar PV plant developed by EnergRed. This latest addition pushes their annual self-consumption past 740,000 kWh, a substantial figure for an individual site. For Palomar, this development represents a clear move towards greater operational resilience and direct control over energy costs.
  • 77 kW solar PV capacity developed by EnergRed.
  • Palomar's total annual self-consumption now exceeds 740,000 kWh.
  • Project located in Certaldo, Italy.
  • Deal announced on March 9, 2026.

Source Intelligence

KEY DETAILS

Palomar is a manufacturing company active in the production of sandwich panels and semi-finished products for the caravan, naval, railway, and aeronautical sectors. This is the third photovoltaic plant built by EnergRed for Palomar. The energy model for Palomar is 'a prezzo stabile', without incentives and without direct investment. The new system will be installed next to two already operational plants. The total annual self-consumption for Palomar will exceed 740,000 kWh after this plant.

Capacity
il terzo impianto fotovoltaico da 77 kW
Location
La toscana Palomar accende il terzo impianto fotovoltaico da 77 kW realizzato con EnergRed a Certaldo... sarà installato su un capannone in via Genova 23
PPA Details
L’accordo con EnergRed prevede una durata di 15 anni... Si tratta di garantire un prezzo stabile con manutenzione inclusa: nel canone energia sono inclusi manutenzione ordinaria e straordinaria, garanzie, assicurazione, monitoraggio e gestione delle performance.
Announcement
Marzo 9, 2026
PARTIES MENTIONED IN SOURCE
P
Palomar offtaker

"La toscana Palomar accende il terzo impianto fotovoltaico da 77 kW realizzato con EnergRed a Certaldo"

E
EnergRed developer

"realizzato da EnergRed"

medium quality Enriched Mar 9, 2026

Timeline

Announced
Mar 9, 2026
Signed
Closed

Get the full picture — timeline, source intelligence, and counterpart analysis.

Subscribe from €20/mo →
Track Solar deals