Deals Counterparts

Errenteria tenders installation of eleven photovoltaic systems totaling 405 kWp

Development Solar tender Spain Mar 6, 2026
405.45 kWp
Capacity

Errenteria has launched a €439,083 tender for 11 PV systems totaling 405.45 kWp. The project, divided into three lots, will enable collective self-consumption across municipal buildings including the Fanderia football field. Bids are due April 9th for the four-month execution period.

Get daily solar deal alerts — free, no spam.

Register free to access full counterpart details, deal analysis, and timeline.

Register free →

Deal Analysis

Errenteria's €439,083 tender for 11 photovoltaic systems, totaling 405.45 kWp, represents a direct investment in municipal energy independence. This development project, structured into three distinct lots, aims to establish collective self-consumption across various public buildings, including the Fanderia football field. The commercial logic centers on reducing operational costs and enhancing energy security for the municipality's assets in Spain. Bidders for this solar development face an April 9th deadline, with a specified four-month execution period, indicating a clear timeline for rapid deployment. This distributed generation approach allows Errenteria to directly benefit from on-site renewable energy production. The project's capacity of 405.45 kWp positions it as a substantial local government initiative within the Spanish solar landscape. Ayuntamiento de Errenteria, managing the public budget for approximately 40,000 residents, is the driving force behind this €439,083 solar tender. The municipality's motivation stems from a commitment to local infrastructure development and sustainable energy solutions for its public facilities. This development type directly contributes to Errenteria's portfolio of public assets by integrating renewable energy generation. The tender, announced on March 6th, 2026, demonstrates the municipality's proactive stance in leveraging solar technology for long-term operational savings. By enabling collective self-consumption, the project directly serves the energy needs of Errenteria's municipal buildings, aligning public spending with environmental and economic objectives.
  • €439,083 tender value for 11 PV systems.
  • 405.45 kWp total capacity across municipal buildings in Errenteria.
  • Project divided into three distinct lots.
  • Four-month execution period post-tender award.
  • Bids due April 9th for the development.
  • Ayuntamiento de Errenteria serves approximately 40,000 residents.

Timeline

Announced
Mar 6, 2026
Signed
Closed

Get the full picture — timeline, source intelligence, and counterpart analysis.

Register free →
Track Solar deals