The Consorci Besòs Tordera de Granollers, through CCB Serveis Mediambientals, has put out to tender a contract for the supply, installation, assembly, and commissioning of a 106 kWp photovoltaic plant at the Vilanova del Vallès wastewater treatment plant for self-consumption.
Counterparts (2)
Developer
C
Consorci Besòs Tordera de Granollers
company
Consorci Besòs Tordera is a public entity focused on the integral water cycle management and environmental recovery of the Besòs and Tordera river basins in Catalonia, Spain. It plans, executes, and manages projects related to water infrastructure, sanitation, and ecological restoration, serving 66 municipalities and the Generalitat de Catalunya.
C
CCB Serveis Mediambientals
company
CCB Serveis Mediambientals is a Spanish company specializing in comprehensive environmental services. They focus on integral waste management, urban cleaning, building and equipment maintenance, gardening, and industrial and beach cleaning services. Their strategy revolves around providing a wide range of environmental solutions primarily within Spain.
Deal Analysis
The Consorci Besòs Tordera de Granollers, through CCB Serveis Mediambientals, has announced a tender for the development of a 106 kWp solar photovoltaic plant in Vilanova del Vallès, Spain. This project, slated for the local wastewater treatment plant, is designed for self-consumption, marking a strategic move towards operational energy independence and sustainability for critical public infrastructure. The deal is currently in the announced development stage, with an announcement date of March 3, 2026.
This tender highlights a public entity's commitment to integrating renewable energy solutions into its operational assets. The self-consumption model for the wastewater treatment plant aims to reduce operational costs, enhance energy security, and contribute to environmental objectives by utilizing solar power. The involvement of Consorci Besòs Tordera de Granollers as the tendering developer underscores public sector investment in green infrastructure and the adoption of sustainable practices within municipal services.
- Development of a 106 kWp solar PV plant.
- Project located at a wastewater treatment plant for self-consumption.
- Public tender initiated by Consorci Besòs Tordera de Granollers (developer).
- Announced in Spain, targeting operational sustainability for public infrastructure.
Source Intelligence
KEY DETAILS
The project execution period is three months. Quote: "El plazo de ejecución del proyecto es de tres meses."
The project does not have funding from European Union funds. Quote: "El proyecto no cuenta con financiación de los fondos de la Unión Europea."
The plant's consumption in 2025 was 680,394 kWh. Quote: "La planta, con un consumo de 680.394 kWh en el año 2025."
The plant has a contracted power of 112 kW in period P1, 116 kW from P2 to P5, and 200 kW in period P6, with a maximum admissible power of 630 kVA. Quote: "dispone de una potencia contratada de 112 kW en el período P1, 116 kW de P2 a P5 y 200 kW en el tramo P6, con una potencia máxima admisible de 630 kVA."
The installation has an emergency generator with an installed power of 88 kW. Quote: "La instalación cuenta con un grupo electrógeno de emergencia con una potencia instalada de 88 kW."
“
Deal Size
El presupuesto total del contrato asciende a 105.270 euros.
“
Capacity
una potencia de 106 kWp
“
Location
Granollers licita un proyecto fotovoltaico de 106 kW para la EDAR de Vilanova del Vallès
“
PPA Details
para el autoconsumo de la planta.
“
Announcement
marzo 3, 2026
“
Expected Close
Las empresas interesadas podrán presentar sus ofertas hasta el 16 de marzo.
PARTIES MENTIONED IN SOURCE
C
Consorci Besòs Tordera de Granollers
developer
"El Consorci Besòs Tordera de Granollers (Barcelona), a través del CCB Serveis Mediambientals, ha sacado a licitación el contrato..."
C
CCB Serveis Mediambientals
developer
"El Consorci Besòs Tordera de Granollers (Barcelona), a través del CCB Serveis Mediambientals, ha sacado a licitación el contrato..."
medium quality
Enriched Mar 4, 2026