ITM supplies electrolyzer stacks to RWE's 100 MW Lingen plant in Germany
ITM has shipped the final batch of stacks to RWE's 100 MW electrolyzer plant in Lingen, Germany, which will supply hydrogen to TotalEnergies' Leuna refinery.
Counterparts (2)
Sign up free to access full counterpart details, deal analysis, and timeline.
Sign up free →Deal Analysis
- ITM supplied electrolyzer stacks to RWE.
- RWE's Lingen plant is 100 MW capacity.
- Project located in Germany, announced 2026-03-06.
- Hydrogen to supply TotalEnergies' Leuna refinery.
Source Intelligence
ITM is a British PEM technology provider: "ha affermato il fornitore britannico di tecnologia PEM.". The plant consists of two 100 MW lines, with the first 100 MW now installed and certified: "L’impianto è composto da due linee da 100 MW, di cui i primi 100 MW sono ora installati e certificati.". The second line is being installed, and the final stacks are arriving: "La seconda linea è in fase di installazione, mentre gli ultimi stack stanno arrivando in loco". The plant will generate up to 3600 kg of hydrogen per hour using electricity from renewable sources: "genererà fino a 3600 kg di idrogeno all’ora utilizzando elettricità da fonti rinnovabili". Hydrogen will be supplied via pipeline: "tramite gasdotto".
"ITM ha spedito l’ultimo lotto di stack all’impianto di elettrolizzatori di RWE a Lingen, in Germania."
"all’impianto di elettrolizzatori di RWE a Lingen, in Germania."
"rifornirà la raffineria TotalEnergies di Leuna, in Germania, tramite gasdotto"
Timeline
Get the full picture — timeline, source intelligence, and counterpart analysis.
Sign up free →
Global Infrastructure Sherpa