Lumcloon Energy and Hanwha Energy complete Shannonbridge B hybrid grid-stabilisation system
180 MWh
Capacity
Lumcloon Energy and Hanwha Energy completed the Shannonbridge B project, Ireland's first hybridised grid-stabilisation system, combining a 4000MVA synchronous condenser with a 180MWh battery energy storage system.
Get daily hybrid deal alerts — free, no spam.
Counterparts (2)
Sign up free to access full counterpart details, deal analysis, and timeline.
Sign up free →Deal Analysis
Lumcloon Energy and Hanwha Energy completed the Shannonbridge B hybrid grid-stabilisation system in Ireland, announced 2026-03-06. This project integrates a 4000MVA synchronous condenser with a 180MWh battery energy storage system, representing Ireland's first hybridised grid-stabilisation system.
- Lumcloon Energy and Hanwha Energy completed Shannonbridge B.
- Ireland's first hybridised grid-stabilisation system.
- Integrates 4000MVA synchronous condenser with 180MWh BESS.
- Announced 2026-03-06.
Timeline
Announced
Mar 6, 2026
Signed
Closed
Get the full picture — timeline, source intelligence, and counterpart analysis.
Sign up free →
Global Infrastructure Sherpa