Midsummer receives SEK 236 million order for thin-film solar cell manufacturing machinery
Swedish solar technology company Midsummer secured a follow-up order exceeding SEK 236 million (~$25.84 million) from a Swedish industrial and defense group for machinery for a thin-film solar cell manufacturing facility. This order, the largest in Midsummer's history, includes its DUO production line for cadmium-free thin-film solar cell manufacturing, covering installation, service, and training. Most of the order value is expected to be recorded as revenue in 2026, with production at the new factory scaling gradually.
Counterparts (2)
Subscribe to access full counterpart details, deal analysis, and timeline.
Subscribe from €20/mo →Deal Analysis
- SEK 236M (~$25.84M) order, Midsummer's largest ever.
- Follow-up deal with a Swedish industrial and defense group.
- Includes cadmium-free DUO production line, installation, service, and training.
- Most revenue expected in 2026 as factory production scales.
Source Intelligence
This order represents the largest single order in the company’s history. Quote: "represents the largest single order in the company’s history." The order includes Midsummer’s DUO production line for thin-film solar cell manufacturing. Quote: "It includes Midsummer’s DUO production line for thin-film solar cell manufacturing." The DUO system enables compact, high-capacity production of flexible cadmium-free thin-film solar cells and is a ready-made production system designed for mass production of cadmium-free thin-film solar cells. Quote: "The DUO system enables compact, high-capacity production of flexible cadmium-free thin-film solar cells.", "The DUO system is a ready-made production system designed for the mass production of cadmium-free thin-film solar cells." The order covers installation, service and training of local factory personnel. Quote: "The order covers installation, service and training of local factory personnel" Peripheral equipment is excluded from the order. Quote: "while peripheral equipment is excluded." Most of the order value is expected to be recorded as revenue in 2026. Quote: "Most of the order value is expected to be recorded as revenue in 2026." Production at the new factory is planned to scale gradually based on demand over the coming years. Quote: "Production at the new factory is planned to scale gradually based on demand over the coming years."
"Swedish solar technology company Midsummer has received a follow-up order"
"The order was placed by a Swedish industrial and defense group"
Timeline
Get the full picture — timeline, source intelligence, and counterpart analysis.
Subscribe from €20/mo →
Global Infrastructure Sherpa